Description
- This machine is small and compact in size.
- Easy to operate and can be used in smaller areas.
- Strong and heavy motor.
- Heavy and Thicker wire rope.
- Product Type : Monkey Crane with Electric Winch
- Winding : 100% Copper Winding
- Phase : Single Phase
- Motor : 3 HP
- Rope Length : 30 meters
- Rope Thickness : 8 mm
- Lifting Speed : 17 m/min
- Capacity : 500 Kg
- Power Source : Electric
- Rated Voltage : 220V
- Rotate : 360°
- Maximum Lifting Height : 30 meters
- Continuous Working Capacity : 2-3 hrs. (Approx.)
- Weight : 115 kg (Approx.)
- Application : Lifting
- Widely used in Civil constructions, restricted areas, rooftop work, steel erection, residential construction, tunnel and underground, forestry, uneven groundwork, marine construction, etc. for lifting materials.
Construction Monkey Crane: The Ultimate Material Lifting Solution
Elevate your construction projects with the Construction Monkey Crane, the industry-leading solution for efficient and safe material lifting.
Unmatched Lifting Capacity:
With a robust lifting capacity of 500 KG, this crane effortlessly handles heavy loads, ensuring seamless material movement on your construction site.
Heavy-Duty Clutch Winch Motor:
Powered by a 3HP heavy-duty clutch winch motor, the crane delivers exceptional power and control, enabling precise lifting and lowering operations.
Durable Construction:
Crafted from high-strength steel, the crane boasts exceptional durability and longevity, withstanding the rigors of demanding construction environments.
Versatile Applications:
Ideal for a wide range of construction tasks, including lifting materials, tools, and equipment, the crane enhances productivity and streamlines operations.
Enhanced Safety Features:
Equipped with advanced safety features, including an automatic overload protection system and a sturdy base for stability, the crane ensures the well-being of your crew.
Value Proposition:
Increased Productivity: Streamline material handling and reduce downtime, maximizing efficiency on your construction site.
Enhanced Safety: Protect your crew and materials with the crane’s robust safety features.
Reduced Labor Costs: Eliminate the need for manual lifting, saving on labor expenses and improving overall project profitability.
Durable Investment: Built to last, the crane provides years of reliable service, minimizing maintenance costs and maximizing your return on investment.
Invest in the Construction Monkey Crane today and elevate your construction projects to new heights of efficiency, safety, and productivity.
Reviews
There are no reviews yet.